Head office in Banat · Serving western Uttar Pradesh

Rooftop solar for homes across western UP, backed by the PM Surya Ghar subsidy.

MV Soler designs, supplies and installs rooftop solar systems across Shamli, Muzaffarnagar, Baghpat and nearby areas — and handles the PM Surya Ghar paperwork so you can get up to ₹78,000 in central government subsidy paid straight to your bank account.

✓ UPNEDA ApprovedResidential & commercialSubsidy paperwork handledNet metering support
1 kW ≈ 4–5 units a day

move your cursor over the panel

₹78,000
Max central subsidy, 3 kW+ system
300
Units/month the scheme aims to cover free
25 yrs
Typical panel service life
4–6
Typical weeks, site visit to commissioning

UPNEDA Approved

MV Soler is an approved vendor of the Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA), the state's nodal agency for renewable energy. Your rooftop solar subsidy application goes through an approved installer.

Government of India scheme

What PM Surya Ghar: Muft Bijli Yojana gets you

PM Surya Ghar is the central government's rooftop solar subsidy programme, run through the Ministry of New and Renewable Energy. It pays a fixed subsidy directly into your bank account after your system is installed and net-metered — on top of whatever Uttar Pradesh adds as a state top-up. MV Soler handles the application and DISCOM coordination as part of every installation.

Central subsidy — residential rooftop CFA SCHEDULE
Pick a system size
₹30,000central subsidy
System sizeRateSubsidy
1 kW₹30,000/kW₹30,000
2 kW₹30,000/kW₹60,000
3 kW and above+₹18,000 for 3rd kW₹78,000 (cap)
Subsidy is capped at 3 kW per household — a larger system doesn't raise the central subsidy beyond ₹78,000. Uttar Pradesh has offered an additional state-level top-up in some cases; MV Soler checks the current figure for your location before you apply.
  1. Register on pmsuryaghar.gov.in

    With your electricity consumer number and mobile number. MV Soler can guide you through this on-site.

  2. DISCOM technical approval

    Your local distribution company checks feasibility for your roof and sanctioned load.

  3. Installation by MV Soler

    We install using ALMM-listed panels and inverters, as required under the scheme.

  4. Net meter & commissioning

    The DISCOM installs a net meter and inspects the system before sign-off.

  5. Subsidy credited to your account

    Typically within 30–45 days of the commissioning report being uploaded.

MV Soler is an independent installation business, not a government office. All subsidy amounts and rules are set by MNRE and can change — always cross-check current figures on the official portal at pmsuryaghar.gov.in before applying.

Common questions

Who can claim the subsidy?

The scheme is meant for households that own a house with a roof suitable for solar panels, have a valid electricity connection, and haven't already taken a solar subsidy for that home. Eligibility rules are set by MNRE — we'll confirm yours during the site visit and on the official portal.

Do I pay the full cost first?

Yes — the subsidy is credited to your bank account after the system is installed, inspected and commissioned, rather than deducted upfront. The scheme also points to bank financing for rooftop solar; ask us or your bank about current loan terms.

What happens to extra electricity my system makes?

With a net meter, surplus power goes back to the grid and is adjusted against what you draw later, so your bill reflects only the difference. The exact credit rules come from your DISCOM.

Is MV Soler an approved installer?

Yes — MV Soler is a UPNEDA approved vendor. The subsidy scheme requires installation by a registered vendor, so ask us for our approval details and you can confirm them when you apply on the official portal.

Does MV Soler do the paperwork?

Yes. We help with registration, DISCOM coordination, net-metering and following up until the subsidy is credited, so you aren't visiting offices yourself.

Solar system guide

Explore a solar system for your home

Choose a system size to see the indicative central subsidy and typical electricity generation. MV Soler can recommend the right size after checking your roof and electricity needs.

Indicative figures only. Final system size and price depend on your roof, usage and site assessment.

Selected system
3 kW
About 13.5 units per day in suitable conditions
Central subsidy
₹78,000
PM Surya Ghar, subject to eligibility and current rules
Indicative cost after central subsidy
₹117,000
Illustrative system cost: ₹195,000

Subsidy and cost figures are indicative, not a quotation. Actual pricing, eligibility and subsidy disbursement must be confirmed with MV Soler and the official PM Surya Ghar portal.

Your system through a day

Illustrative output for a clear day. Real generation varies.

0 kWabout 13.5 units today
6 AM9 AM12 PM3 PM6 PM
12:00 PM time of day
What we do

End-to-end solar, not just panels on a roof

From load assessment to the final subsidy credit, MV Soler manages the full installation so you're not chasing vendors, DISCOM offices, and paperwork on your own.

Residential rooftop solar

System sizing, design and installation for homes — sized to your actual bill, not oversold.

Sized to your bill and your roof. Includes design, mounting structure, inverter and wiring, plus the subsidy paperwork.

Tap for details +

Commercial & shop installations

Solar for small businesses, shops and institutions looking to cut daytime power costs.

Works best where power is used in the daytime. We size the system to your sanctioned load and how you actually use electricity.

Tap for details +

Subsidy & DISCOM liaison

We register your application, coordinate net metering and follow up until the subsidy is credited.

Portal registration, DISCOM approval, net metering and follow-up, all the way to the subsidy landing in your account.

Tap for details +

Maintenance & cleaning

Panel cleaning, inverter checks and troubleshooting to keep generation close to rated output.

Regular panel cleaning, inverter and connection checks, and quick troubleshooting if your generation drops.

Tap for details +
From enquiry to switch-on

How an MV Soler installation runs

Roughly four to six weeks, depending on how quickly your DISCOM processes approvals. Tap a step to see what happens.

Site visit

We inspect your roof, check for shading, note your sanctioned load and look at your recent bills, so the system we propose fits your actual usage.

Where we work

Head office in Banat, installing across western Uttar Pradesh

MV Soler's head office is in Banat, Uttar Pradesh. From there we install across Shamli district and the neighbouring districts of Muzaffarnagar and Baghpat — and we're expanding to more towns. Tap a place to highlight it. Not on the list? Get in touch anyway — we take on nearby jobs case by case.

Head office
Shamli district
Muzaffarnagar
Baghpat district

More towns added as we grow — ask us about yours.

BANAT · HQ Shamli Kairana Thana Bhawan Kandhla Jhinjhana Muzaffarnagar Baraut Baghpat
Banat — head office. (illustrative map, not to scale)
Get in touch

Request a site visit and quote

Tell us about your roof and electricity needs — we'll recommend a suitable system and walk you through the PM Surya Ghar subsidy.

Chat on WhatsApp
Office / workshop
64, Subhash Nagar, Banat, Shamli, Uttar Pradesh

or message us on WhatsApp instead